- manday & tuesday the whole class was @ thomas pattullo everything started a bit chilling & slowly and for the first day we were briefly told what was the whole block all about & on the 2nd day wrote two tests (stw&ctd)
-wednesday paid a visit to the greenpoint park did some sketches of the structures, joints connection and shown everything has now changed from wayback were by domes were built with bamboo and joined with animal skin straps and covered with animal skins /canvases and now in nowadays they are built with steel columns,beamsand joined with bolts and steel plates and supported with concrete footing instead of rocks and big stones and some of the spaces have suspended roofs as symbol of walkways & and seating areas.the hub with performance stage, steel bracing.
-thursday went to site for the first time after the january site visit and we were shown what we needed to do firstly we painted the timber beams as a team with one of my group members we prepared sandwiches for the lunch time and after that we continued with some more work while others were busy with the columns concrete footings on the site and knocked of @ 15h30.

No comments:

Post a Comment